There’s lots of work happening from the ground up at our new store site. The finishing touches are going on the roof, including the infrastructure needed for solar panel installation later. Inside, the clock ticks to complete the portions of plumbing and electric work that needs to happen before the big concrete floor pour next Friday. Take a look: